Your browser is out of date!

Update your browser to view this website correctly.

Google Chrome

Mozilla Firefox

Internet Explorer

Apple Safari

Opera

×

Net Positive Energy Commercial Building

In March 2024, SIFS completed an office building in Jebel Ali Industrial first. The building was originally designed with typical green building regulations for building envelope. The client approached SIFS with the intent of reducing the operational energy for the building & seeing the possibility of building a net-zero-energy building.
Since HVAC is the largest energy consumption source for an office building in the Middle East, SIFS proposed reducing U-values for the building envelope, complemented with other active energy savings measures (optimized air conditioning design & lighting controls). The client’s Initial design (insulation values of 0.57 W/m2K for the wall and 0.3 W/m2K for the roof) was upgraded to SIFS building envelope systems, and the design calculations showed that the required 26 tons of air conditioning had been reduced to 16 tons i.e. a 38% reduction to cooling design due to the building envelope upgrade.
The building was commissioned on March 1st, 2024 & the client had set up a real-time monitoring system (a typical BMS system) in the office which helped monitor and evaluate the energy consumption of the building.
To ensure net zero energy building, a 33 kW PV system was installed on the available roof space and was commissioned on June 21st, 2024.
A financial analysis comparing the client's original design with the upgraded SIFS design demonstrated that prioritizing passive energy-saving strategies resulted in a lower overall cost for constructing a net-zero-energy building.

INNOTECH POLYMERS - SIFS Envelope Improvement Case study - Net Zero Construction Costs
Supply & Installation - Capital costs Standard Green Building Construction
(original design)
SIFS Envlope Design
(upgraded design)
1 Building Structural AED 2,000,000 AED 2,000,000
2 Wall Insulation AED 185,152 AED 246,400
3 Roof insulation AED 29,300 AED 43,950
4 Windows AED 37,995 AED 43,350
5 Air conditioning AED 66,389 AED 70,815
Total Construction AED 2,318,836 AED 2,404,515
Solar PV System AED 320,284 AED 170,000
Total Capital Investment AED 2,639,120 AED 2,574,515
Notes:
Electricity Tariff-AED 0.35/kwh;
AC load calculations based on HAP analysis
U VALUE-thermal insulation performance
No maintenance cost considered
No energy price inflation considered

Real-time & historical data collected can be found through the dashboard below:

A review of 6 months of consumption data collected (between March 1st – August31st) and 2 months of Solar PV production (July 1st - August 31st) suggests that this office building is on its way to becoming a “Net Positive Energy Building” becoming the first in the region. An annual prediction* using this data is shown below.

*An update will be provided next on November 2024

PROJECT PARTNERS

Get In Touch

Address

Logo

Smart Insulation Finishing Systems LLC
Office Address: SIFS, New Industrial area, Umm Al Thoub, Umm Al Quwain, U.A.E
Head Office: SIFS, Aspect Tower 805, Executive Towers, Business Bay,
Dubai- U.A.E
+97167064333 ,+97156696 0006
bejay@sifs.me

Quick Enquiry

Top